References

GUZMÄNNER meets the highest demands and expectations of clients at home in Slovakia and abroad.

Our staff welded cranes and crane structures for Liebherr, bridge and motorway structures for Deutsche Bahn, chassis parts for forklift trucks of Jungheinrich, or various load-bearing structures of halls, bridges, roundabouts or stadiums as for example for the Bundesliga team SC Freiburg. These constructions consist of black material welded by the MAG method with weld tests on ultrasound, X-ray or magnets.

Another big indicator is welding and installation of piping systems stainless steel, evaporators, refrigeration equipment, pressure tanks and various vessels in the food and pharmaceutical industries.

Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Default Title
Default Title
Default Title
Default Title

We also participated in construction of buildings and piping systems for GSK, on the construction of new production facilities such as BOSCH in Dresden, where our staff fabricated a complete piping system in black material and also stainless steel; or, for example, the extension of a VW, Porsche or Wiesmann plant hall, including the welding of the supporting structures with the 111 hand electrode.

In the Czech Republic we participated in construction of the heating pipeline, which is more than 30 km long and connects the nuclear power plant with the power company in České Budějovice. In addition, our staff welded various products for the military industry, including welding of armoured vehicles for Saudi Arabia at VOP Šenov in the Czech Republic.

Our company actively works with professionally trained and certified (SCC 017) management staff who communicate in German or English. The strengths of these leaders include managing work teams and coordinating work in the workplace.

Thanks to these executives, we have made significant contributions to various projects, including

Installation of evaporators including welding in Zott dairies / construction of FunderMax plant for particleboard production including silos , which was welded with hand electrode 111 / complete construction of stainless steel relaxation and swimming pools including assembly / replacement and TIG welding of piping systems in both ferrous and stainless steel at the BSW steelworks and construction of a new tank with complete hydraulic system for molten steel or shutdown at the Wacker chemical plant.

We will be happy to provide you with complete references of our partners upon request.

Please enable JavaScript in your browser to complete this form.

Trainee data

Name and surname of the trainee:

Questions

1. Are all employees required to comply with safety regulations?
2. Am I allowed to remove and arbitrarily change the safety cover while working?
3. Am I obliged to use the assigned PPE?
4. Can I smoke outside a designated smoking area?
5 Is an accident work-related if it happens on the way to work?
6. If I suffer an accident or minor injury on the job, I must notify my supervisor.
7. Are only workers in hazardous workplaces allowed to consume alcoholic beverages?
8. Is the hot smoke from a fire dangerous to health?
9. Containers with combustibles must be closed and stored on catch basins.
10. If the fire cannot be extinguished by my own efforts, is it necessary to issue a fire alarm?
11. The telephone number of the integrated rescue system is 112.
12. A fire extinguisher that has been used to extinguish a fire shall be replaced with a serviceable one.
13. Can hydrant (water) fire extinguishing also be used on live equipment?

Signature of the trainee

Consent to Privacy Policy

Attachments: